CRITICAL PATH METHOD AND LEAN DESIGN MANAGEMENT APPLIED IN DESIGN OF SOLAR ENERGY PROJECTS: A COMPARISON STUDY
Abstract
Delays in the construction sector occur frequently in projects and have a major impact on the cost, duration, and quality of the project. Classic management theoretic principles applied, lack of commitment to project management methods altogether with slowing down in the adoption of current technologies could explain problems of project management consisting in frequent project failures. The
present research aims to use the lean management method in the construction activity starting with the design management. The paper presents two comparative case studies: the first in the classical management solution and the second using the steps of the lean method, in corroborating the information necessary for: design the installed capacity to produce electricity (photovoltaic solar panels), design their
positioning and installation on roofs terrace to existing structures that have undergone various changes over time. In addition, the Investor requested other interventions that required the involvement of several specialists from different fields. Performance indicators were calculated between the two solutions, favorable to the lean method.
Full Text:
PDFReferences
S. Durdyev, M. Omarov, and S. Ismail, “Causes of delay in residential construction projects in Cambodia,” Cogent Eng., vol. 4, no. 1, (2017)
L. Koskela and G. Ballard, “Towards Lean Design Management,” Educ. Theory, vol. 1, no. 4, pp. 241–247, (1997).
J. Burati, J. Farrington, and Ledbetter William, “Causes of Quality Deviations in Design and Construction,” J. Constr. Eng. Manag., (1992).
P. A. Tilley, “Lean design management - A new paradigm for managing the design and documentation process to improve quality?,” 13th Int. Gr. Lean Constr. Conf. Proc., no. January, pp. 283–295, (2005).
E. I. Galaz-Delgado, R. F. Herrera, E. Atencio, and F. M. Rivera, “Problems and Challenges in the Interactions of Design Teams of Construction : A Bibliometric Study,”(2021).
G. A. Howell, G. Ballard, and I. Tommelein, “Construction Engineering—Reinvigorating the Discipline,” J. Constr. Eng. Manag., vol. 137, no. 10, pp. 740–744,( 2011).
L. Koskela and G. Howell, “The underlying theory of project management is obsolete,” IEEE Eng. Manag. Rev., vol. 36, no. 2, pp. 22–34, (2008).
L. Koskela, “Application of the new production philosophy to construction,” vol. 72, (1992).
R. F. Herrera, C. Mourgues, L. F. Alarcón, and E. Pellicer, “An assessment of lean design management practices in construction projects,” Sustain., vol. 12, no. 1, pp. 1–19, (2020).
B. Mota, C. Biotto, A. Choudhury, S. Abley, and M. Kagioglou, “Lean design management in a major infrastructure project in UK,” 27th Annu. Conf. Int. Gr. Lean Constr. IGLC 2019, no. November 2019, pp. 37–48,( 2019).
G. Ballard, “The Last Planner System of Production Control,” no. January,( 2000)
Ballard, Glenn, Hamzeh, Farook, Tommelein, “The Last Planner Production Workbook-Improving Reliability in Planning and Workflow,” Lean Constr. Inst., vol. 53, no. 9, pp. 21–25, (2007).
J. Lerche, H. H. Neve, G. Ballard, J. Teizer, S. Wandahl, and A. Gross, “Application of Last Planner System to Modular Offshore Wind Construction,” J. Constr. Eng. Manag., vol. 146, no. 11, p. 05020015, (2020).
Cremona Matteo, The application of Last Planner System in Construction Design. LAP LAMBERT Academic Publishing, (2013).
F. R. Hamzeh, G. Ballard, and I. D. Tommelein, “Is the Last Planner System applicable to design? A case study,” Proc. IGLC17 17th Annu. Conf. Int. Gr. Lean Constr., no. July, pp. 165–176, (2009).
C. N. Biotto, “Integration of overlapped design and construction stages through location-based planning tools.,” p. 311, ( 2018).
EUBIM Task Group, “Handbook for the introduction of Building Information Modelling by the European Public Sector,” EU BIM Task Gr., p. 84, (2016).
G. S. Mughees Aslam, Zhili Gao, “Integrated implementation of Virtual Design and Construction (VDC) and lean project delivery system (LPDS),” J. Build. Eng., (2021).
M. Lorenz, M. Rüßmann, R. Strack, K. L. Lueth, and M. Bolle, “Man and Machine in Industry 4.0,” Bost. Consult. Gr., p. 18, (2015).
B. Bungardi, M. Izvercian, A. Pugna, A. Agache, “Unmanned Aerial Vehicle (UAV) in construction management: a literature review, applications and challenges”, RMEE2020, presented, not indexed.
Refbacks
- There are currently no refbacks.